top of page

Miscellaneous Projects 

Ash Grove Unloading Terminal

The Ash Grove Unloading Terminal project was the excavation, placing, and backfilling of the concrete equipment pit and conveyor pits under the railroads. We installed various metals and the final concrete work including pipe supports and building footings. 

Riverside Parking Structure

The Riverside Parking Structure Improvement project was a remarkable Design-Build project, reconstructing a failing section of the overhanging parking structure. Clearwater Construction teamed with Coffman Engineers and Budinger & Associates to develop a feasible design recommendation that would accommodate the owners schedule and budget.

 

Lime Slurry Tank Removal

The Lime Slurry Tank Removal and Installation project consisted of the removal and installation of a lime slurry tank at the Waste to Energy Facility in Spokane, WA.