Clearwater
Construction & Management, LLC
Home Projects Contact Employee Login
Water Treatment Plants
CDA WWTP Phase 5C.1 The City of Coeur d’Alene Wastewater Treatment Plant initial TMF and nitrification Improvements included construction of new tertiary membrane filtration equipment building, new mixing, aeration and membrane tanks, and secondary effluent transfer pumping station. The project included both below and above ground cast in place tanks and buildings with complicated piping penetrations and building connections through out.
CDA WWTP aeriel view
Clarkston WWTP The Clarkston Wastewater Treatment Plant is the expansion of an existing facility in the City of Clarkston, WA. Clearwater’s scope included all of the cast-in-place concrete for the new headworks, grit removal, anoxic basin, and 2 clarifiers totaling nearly 3,000CY.
New Clarifier
Lapwai WWTP Lapwai Waste Water Treatment Plant is a green field facility located in Lapwai, idaho and was built under a joint contract with the ciy of Lapwai and the Nez Perce Tribe. The completed project was a Class A discharge membrane filtration facility, complete with on site lab, office, sludge press, and backup generator.
Pump gallery and piping
Bozeman WWTP The Bozeman Wastewater Treatment Plant project was a major expansion of the city of Bozeman’s existing facility, Clearwater’s role in the project was to pour more than 7,000CY of cast in place concrete. The project involved several work elements including a primary effluent pump station, a membrane bioreactor nearly the size of a football field and twin secondary clarifiers.
Waste water treatment tanks
Clearwater Construction & Management -- (509) 363-0414 WA: CLEARCM948PO -- ID: RCE-19873/PWC-C-17456-unlimited -- MT: 159179