Clearwater
Construction & Management, LLC
Home Projects Contact Employee Login
Reservoirs
Hauser Reservoir The Hauser Reservoir is a new 300,000 gallon above ground cast in place concrete reservoir completed in 2013. Work included site piping, precast vault, swales, and new security fencing.
Final tank and site
Farragut Reservoir Rehab Farragut Reservoir Rehabilition Project completed in 2012 was undertaken to extend the useful life of the 72  year old, 135’ tall cast in place concrete reservoir. The scope included removing and replacing the steel lid, removing the exisitng liner, applying a new CIM liner, installing new stairs and ladders, construction of a pump house and installing 1,200 LF of water main.
Painting the exterior of 135’ Reservoir
Suncrest Reservoir The Suncrest Water Reservoir Project completed in 2007 was a cast in place concrete reservoir that provides 1.85 million gallons of added capacity to the strained Suncrest water system. The procurement mechanism on the project was design/build, and we worked closely with Coffman Engineering of Spokane, to resolve the site challenges including steep slopes and rock outcroppings.
Placing Reservoir slab on Grade
Pasadena Reservoir Pasedena water reservoir was located on side of a steep hill in a rocky outcropping. With strong relations with the owner and Central Pre-Stress, Clearwater was able to build a 1.75 million gallon tank.
Setting precast pieces and bracing in place
Clearwater Construction & Management -- (509) 363-0414 WA: CLEARCM948PO -- ID: RCE-19873/PWC-C-17456-unlimited -- MT: 159179