Construction & Management, LLC
Home Projects Contact Employee Login
Pullman Building Supply Pullman Building Supply project was footings retaining walls and finished slab floors for a new building supply store in Pullman wa, completed 2014-2015.
Store Slab and Building erection
Cheyne Transfer Station Cheyne Transfer station is a new transfer facility at the exisitng landfill site near Yakima, WA. Clearwater’s portion of project included all cast in place concrete for the scales, houshold hazardous waste and the transfer building walls and tipping slab.
Transfer station Slab placement
WSU Steam Tunnel Rebuild The Washington State University Tunnel Lid rebuild consisted of removing the exisiting failing tennel lid alonf 370 LF of campus sidewalk and replacing it with new cast in place lid. Work included electrical, asphalt, curbing, and supporting side tunnels and steam piping inside the tunnel. During the construction the exisitng steam piping had to be protected in place and not disturbed due to asbesto insulation.
New tunnel lid/sidewalk
Greene St Water Main Greene St Bridge water main project consisted of approximately 450 Linear feet of 24” fusible PVC piping pulled through the exisitng 30” steel water main suspended beneath Greene St bridge over the Spokane River.
Welding flexible PVC Pipe